Vemb Wind Park, Vemb, Denmark

  • Byggnadstyp:
  • Energibyggnad
Hel skärm Stänga Street View

Peikko has supplied Gravity Foundation Technology for the Vemb wind farm project, located near the Western part of Jutland, Denmark. The project consists of 12 units of Vestas 3.3 MW wind turbines with total height of 140 meters.

The deliveries comprised of Anchor cage including bottom flange, Anchor Bolts, Headed studs, Peikko foundation reinforcement and other needed parts to the site. Peikko is also responsible for the foundation design and structural calculations.

The 39 MW order of Vemb Wind Park project is part of a frame agreement and has been placed by long-time Vestas customer Skovgaard Invest ApS. The order for the “Øst for Vemb” project includes supply, installation and commissioning of the wind turbines. The wind park project is operational by the end of 2015.

The Vemb project showed how Peikko managed in a very short time, during summer holiday, to squeeze in a project schedule and deliver Peikko’s solutions in time so erection of the wind turbines was not delayed.

Läs mer down-arrow.png

Fakta om projektet

Leveransår:
2015
Färdigställandeår:
2015
Turbintillverkare:
Vestas
Turbinstorlek, MW:
3.3
Centrumhöjd, m:
85

Lösningar vi tillhandahöll

Jonas Høg

Jonas Høg

Direktør

Bygningsingeniør

Mob. +45 5120 5658
[email protected]